Browse
Search
Agenda - 04-23-2013 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 04-23-2013 - Regular Mtg.
>
Agenda - 04-23-2013 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 12:01:18 PM
Creation date
10/24/2013 9:33:52 AM
Metadata
Fields
Template:
BOCC
Date
4/23/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 04-23-2013
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
RES-2013-033 Resolution of Approval of Annandale at Creek Wood Preliminary Subdivision Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46 <br /> Hydrograph Summary Re po Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2011 by Autodesk, Inc.v8 <br /> Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph <br /> No. type flow interval Peak volume hyd(s) elevation strge used Description <br /> (origin) (cfs) (min) (min) (cuft) (ft) (cuft) <br /> 1 SCS Runoff 8.249 1 733 57,383 Pre-Dev Site <br /> 2 SCS Runoff 108.57 1 734 474,499 Remaining Basin <br /> 3 Combine 116.81 1 734 531,882 1,2 Outfall-Pre <br /> 10 SCS Runoff 15.37 1 732 81,963 Post-Dev Site <br /> 11 SCS Runoff 108.57 1 734 474,499 Remaining Basin <br /> 12 Combine 123.72 1 734 556,463 10, 11 Outfall-Post <br /> Preliminary Drainage Calcs.gpw Return Period: 1 Year Friday, Aug 31, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.