Browse
Search
Agenda - 05-14-1996 - IX-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 05-14-1996
>
Agenda - 05-14-1996 - IX-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2013 3:57:18 PM
Creation date
10/23/2013 3:57:17 PM
Metadata
Fields
Template:
BOCC
Date
5/14/7199
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-C
Document Relationships
Minutes - 19960514
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ r <br /> 4 <br /> Estimated Cost of New Facilities <br /> Elementary School Capacity = 600 students Square Footage 95,225 <br /> Square Ft. per Student 158.7 <br /> Construction Cost Cost Per Square Foot $ 90 $ 8,570,250 <br /> Site Acquisition Acres: 16 <br /> Average Cost Per Acre: 25,000 $ 400,000 <br /> Site Development As a percentage of Construction Cost 10% $ 857,025 <br /> Fees As a percentage of Construction Costs and Site Development 10% 942,728 <br /> Moveable Equipment As a percentage of Construction Cost 5% $ 428,513 <br /> Technology Cost per square foot $ 8.25 $ 785,606 <br /> (includes cabling and equipment for voice, video and data distribution systems) <br /> Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 471,364 <br /> Start-Up Costs Non Personnel One time start-up costs $ 330,000 <br /> Total $ 12,785,485 <br /> Middle School Capacity = 700 students Square Footage 132,192 <br /> Square Ft. per Student 188.8 <br /> Construction Cost Cost Per Square Foot $ 95 $ 12,558,240 <br /> Site Acquisition Acres: 22 <br /> Average Cost Per Acre 25,000 $ 550,000 <br /> Site Development As a percentage of Construction Cost 10% $ 1,255,824 <br /> Fees As a percentage of Construction Costs and Site Development 10% 1,381,406 <br /> Moveable Equipment As a percentage of Construction Cost 5% $ 627,912 <br /> Technology Cost per square foot $ 8.25 $ 1,090,584 <br /> (includes cabling and equipment for voice, video and data distribution systems) <br /> Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 690,703 <br /> Start-Up Costs Non Personnel Start Up -one time $ 350,000 <br /> Total $ 18,504,670 <br /> R <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.