Browse
Search
1996 S Purchasing & Quality Mechanical for Animal Shelter Drain Renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1996
>
1996 S Purchasing & Quality Mechanical for Animal Shelter Drain Renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2013 11:45:18 AM
Creation date
10/23/2013 9:30:11 AM
Metadata
Fields
Template:
BOCC
Date
4/16/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-C
Document Relationships
Agenda - 04-16-1996 - IX-C
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1996\Agenda - 04-16-1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 6 <br /> FINAL PAYMENT <br /> Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when(1) <br /> the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming <br /> Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily <br /> survive final payment;and(2)a final Certificate for Payment has been issued by the Architect;such final payment shall be made by <br /> the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: <br /> ARTICLE 7 <br /> MISCELLANEOUS PROVISIONS <br /> 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document,the ref- <br /> erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. <br /> 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below,or in <br /> the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. <br /> (Insert rate of interest agreed upon, if any.) <br /> (Usury laws and requirements under the Federal Truth in Lending Act,similar state and local consumer credit laws and other regulations at the Owner's and <br /> Contractor's principal places of business,the location of the Project and elsewhere may affect the validity of this provision.Legal advice should be obtained <br /> with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) <br /> 7.3 Other provisions: <br /> ARTICLE 8 <br /> TERMINATION OR SUSPENSION <br /> 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. <br /> 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT• TWELFTH EDITION • AIA© • ©I987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20006 A101-1987 5 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.