Orange County NC Website
ARTICLE 4 <br /> CONTRACT SUM <br /> 4. Th Ow eX shall the Contr ct r in curr nt fut�ds fo thgg,Corr�ractor's pper orm��nn o he Contract the Contract Sum of <br /> orgy l�zne- iousanc� °FoururiQrC TWCIVC a21 �U�1�� Dollars <br /> (.s 49,412.00 ), subject to additions and deductions as provided in the Con- <br /> tract Documents. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br /> hereby accepted by the Owner: <br /> (State the numbers or other identification of accepted alternates.If decisions on otber alternates are to be made by the Owner subsequent to the execution of <br /> this Agreement, attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) <br /> Alternate #1 and Alternate #2 <br /> 4.3 Unit prices, if any, are as follows: <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • A[Ae • ©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20006 A101-1987 3 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. <br />