Orange County NC Website
f <br /> D (� 117 <br /> Uu !U1 BOCC 3/6/96 Regular Meeting Minutes <br /> x <br /> A. ! 94SPEC3M PROGRAM FEES (8:55-9:10) <br /> Rod Visser provided a report on current fire inspection program fees and suggestions for <br /> reviewing the sdie"of fees as outlined in the agenda. <br /> Commissioner HaNdotis said he supports the recommendations. His concern is with small <br /> businesses paying the full fee. He feels that the 10%fee that Hillsborough has added is not fair. His other <br /> Concern is that, because of doing the fire inspections for the Town of Hillsborough, the County does not get <br /> around to inspections in the County. <br /> In answer to a question from Commissioner Gordon, Rod Visser indicated that the Town would <br /> need.8 of a person to do their own inspections. <br /> Mr.Jack Davis made reference to the fire inspection at his place of business on July 13, 1994. The <br /> inspec dorh took 20 minutes and they found two violations. He does not feel it is fair to charge him 5165.00— <br /> Vw same as it cost to inspect WalMart or a larger facility. He told about his ordeal with the Magistrate's <br /> offke. He asked that the County Commissioners rescind the contract with Hillsborough and charge a <br /> reasonable amount for the inspection. <br /> Commissioner Gordon said she wants the program to be self-supporting through fee revenue. <br /> Commissioner Wiillholt said he does not want to charge a fee to schools or public entities. He feels <br /> On feels should be realigned with the time it takes to do the inspection or the square footage to be inspected. <br /> Ri. RFT;BMBLE DEVELOPMENT PROPOSAL. <br /> Planner David StanW presented a report on the Planning Board's recommendations <br /> concerning proposed Flexible Development open space preservation strategies that were presented at a <br /> pubic hearing on November 27, 1995. He summarized the recommendations as listed on pages 5,6 and 7 <br /> of the agenda abstract He presented an implementation schedule for the Board's consideration of approval. <br /> Commissioner Wilthoit noted that the Planning Board discussed having an intensive orientation <br /> to distribute the information and asked if June 17 through June 28 workshops address this issue. David <br /> Stencil said that the intent is to do these initial training workshops and then to provide ongoing workshops <br /> once a month or as often as necessary. <br /> Commissioner Willhoit made reference to the issue of the yield plan and asked if it was <br /> necessary to do a conventional design in order to get a yield plan. David Stencil said that the basic yield plan <br /> would be to do a conventional design to see how many lots could be created on the site and then to <br /> e than in accordance with the open space provisions. <br /> Commissioner Willhoit said he feels that affordable housing should be a flexible option rather <br /> than a separate category. He feels that if a developer comes in with a flexible plan that provided affordable <br /> housing or one that provided open space and met a criteria of 40 or 50%open space, they should not have <br /> to do a yield plan. David Stencil stated that, as it now stands,they would still need to do a yield plan. <br /> Commissioner W iillhoit feels that if a plan cones in which more than meets the level of open <br /> space required that it may be desirable to eliminate the yield plan. He made reference to the annual review <br /> and said he preferred a system where each time a development comes in it is tracked instead of waiting for a <br /> year to accumulate the data. <br /> A motion was made by Commissioner Gordon, seconded by Commissioner Crowther to <br /> accept the report and approve continuing the discussion on this item at a work session scheduled for March <br /> 21. 1996 at the Government Services Center in Hftborough at 7:30 p.m. After the work session the Board <br /> will consider the timeline for implementation of the flexible development proposal. <br /> VOTE: UNANIMOUS <br /> TOTAL P.01 <br />