Browse
Search
2013-439 AMS - Corley, Redfoot Architects Inc for Whitted Meeting Room Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-439 AMS - Corley, Redfoot Architects Inc for Whitted Meeting Room Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 9:47:35 AM
Creation date
10/22/2013 9:39:48 AM
Metadata
Fields
Template:
BOCC
Date
5/7/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7a
Document Relationships
R 2013-439 Corley, Redfoot Architects Inc for Whitted Meeting Room Design
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 7M <br /> Document 8151 - 1997 <br /> Abbreviated Standard Form of Agreement Between Owner and Architect <br /> AGREEMENT made as of the eight"n (801) day of Becetrtber <br /> in the year of two thousand and nine (2009). <br /> (In words, indicate day, month and year) ' <br /> BETWEEN the Architect's client identified as the Owner: <br /> (Name, address and other information) <br /> This document has important <br /> legal consequences. <br /> County of Orange Consultation with an attorney <br /> Asset Management and Purchasing Services is encouraged with respect to <br /> 131 West Margaret Lane, #301 its completion or modification. <br /> TVL1ls ,.)rough, NC 27278 <br /> and the Architect: <br /> (Name, address and other information) <br /> Corley Redfoot Zack, Inc- <br /> 222 Cloister Court I <br /> Chapel Hill, NC 27514 <br /> I <br /> I <br /> For the following Project: <br /> (Include detailed description of Project) <br /> I <br /> Phase IC - John M. Link, Jr., Building Renovation: <br /> Project includes designing the Eolloaing scope of work: <br /> - B:)ard of C'r.)unty Commissioners Meeting room and support areas (1st level) <br /> - New ,public toilet rooms (1st level) <br /> - Additional work necesary to complete the Eire suppression system <br /> I <br /> I <br /> I <br /> I <br /> • I <br /> The Owner and Architect agree as follows. <br /> i <br /> AIA Document B151TI.1—1997.Copyright©1974,1978,1987,and 1997 by The American Institute of Architects.All rights reserved.WARNING:This <br /> AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, <br /> or any portion of it,may result In severe elvil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail <br /> The American Institute of Architects'legal counsel,copyright @ala.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.