Orange County NC Website
As requested above, this amendment would raise the original contract from the current$61,300.00 to <br /> the amended amount of$110,500.00. Should the proposed amendment be approved,the County <br /> would be invoiced the$110,500, less the$24,278 already invoiced and paid. The proposed scope of <br /> work for the remainder is as follows: <br /> 1. The scope of work that has already been completed between 1/1/13 and today <br /> 2. The development of the design of a BOCC-adopted program. <br /> 3. Schematic and Design development documents <br /> 4. Construction documents including all permitting requirements <br /> 5. Standard construction administration services though the construction duration <br /> Items not included in the above fees are: <br /> 1. Surveys and Testing <br /> 2. Legal fees <br /> 3. Asbestos investigation/removal <br /> 4. Water damage investigation/design solutions/repairs. <br /> 5. Perspectives, renderings or models <br /> 6. LEED certification and design services <br /> Based upon BOCC approval, it is our understanding that Schematic Design/Design Development is <br /> anticipated to begin in July 2013, Construction Documents completed by mid-November, 2013 and <br /> bidding and contract award thereafter. Construction is anticipated to begin in early January,2014 <br /> and be complete in May, 2014. <br /> We appreciate the opportunity to work with you on the proposed project. If you are in agreement with <br /> this proposal,please sign below and return a copy to our office for our files. <br /> Sincerely, ` <br /> Kenneth E.Redfoot,AIA <br /> President <br /> • <br />