Browse
Search
2013-439 AMS - Corley, Redfoot Architects Inc for Whitted Meeting Room Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-439 AMS - Corley, Redfoot Architects Inc for Whitted Meeting Room Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 9:47:35 AM
Creation date
10/22/2013 9:39:48 AM
Metadata
Fields
Template:
BOCC
Date
5/7/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7a
Document Relationships
R 2013-439 Corley, Redfoot Architects Inc for Whitted Meeting Room Design
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As requested above, this amendment would raise the original contract from the current$61,300.00 to <br /> the amended amount of$110,500.00. Should the proposed amendment be approved,the County <br /> would be invoiced the$110,500, less the$24,278 already invoiced and paid. The proposed scope of <br /> work for the remainder is as follows: <br /> 1. The scope of work that has already been completed between 1/1/13 and today <br /> 2. The development of the design of a BOCC-adopted program. <br /> 3. Schematic and Design development documents <br /> 4. Construction documents including all permitting requirements <br /> 5. Standard construction administration services though the construction duration <br /> Items not included in the above fees are: <br /> 1. Surveys and Testing <br /> 2. Legal fees <br /> 3. Asbestos investigation/removal <br /> 4. Water damage investigation/design solutions/repairs. <br /> 5. Perspectives, renderings or models <br /> 6. LEED certification and design services <br /> Based upon BOCC approval, it is our understanding that Schematic Design/Design Development is <br /> anticipated to begin in July 2013, Construction Documents completed by mid-November, 2013 and <br /> bidding and contract award thereafter. Construction is anticipated to begin in early January,2014 <br /> and be complete in May, 2014. <br /> We appreciate the opportunity to work with you on the proposed project. If you are in agreement with <br /> this proposal,please sign below and return a copy to our office for our files. <br /> Sincerely, ` <br /> Kenneth E.Redfoot,AIA <br /> President <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.