Orange County NC Website
All <br /> 6? n 5 <br /> [Departmental Use Only] <br /> TITLE Roof Replacement <br /> FY 2014 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$1,000,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called "Agreement"), made as of the 14th day of <br /> October, 2013, by and between Owens Roofing, INc., (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS;PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract and are fully <br /> incorporated herein. In the event of any inconsistency between or among the Contract Documents the <br /> Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORIC <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work required by <br /> this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the <br /> Contractor and Owner and in accordance with the following enumerated documents, which are made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared by (Bid #1671 - see Bid Analysis Form (Sheet 2 & 3 dated <br /> Dated September 19,2013) <br /> b. Written specifications prepared by the project engineer. <br /> c. Roof Replacement proposal dated September 19, 2013 which fully describes the work to be <br /> performed,such work(hereinafter called the"Work"). <br /> d. Related documents listed under Section 1 above. <br /> i <br /> I <br /> 3. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. <br /> Revised November 2011 1 <br />