Orange County NC Website
ARTICLE 4 <br /> CONTRACT SUM <br /> 4.1 T Owner sh ay the Contractor in current fu ds for the Contractor's performance of the Contract the Contract Sum of <br /> T ip rty T90pusand One and 00?100 Dollars <br /> (S 30,001 .00 ), subject to additions and deductions as provided in the Con- <br /> tract Documents. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br /> hereby accepted by the Owner: <br /> (State the numbers or other identification of accepted alternates.if decisions on other alternates are to be made by the Owner subsequent to the execution of <br /> this Agreement,attach a schedule of such other alternates shou-ing the amount for each and the date until u,hicb that amount is valid.) <br /> Alternate #1 and Alternate #2. <br /> 4.3 Unit prices, if any, are as follows: <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT- TWELFTH EDITION • AIA® • ©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.200W A101-1987 3 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. <br />