Orange County NC Website
a <br /> Y <br /> 2 <br /> plumbing repairs, minor electrical repairs. Landlord will provide all maintenance to HVAC, roof, exterior of <br /> building,sidewalks,parking lot and any other repairs which exceed the ceiling amount established as County <br /> responsibility. <br /> Upfit: The Landlord has agreed to complete the following work: <br /> Construct restrooms;and <br /> Replace HVAC equipment. Note: Programming information to establish a floor plan for the facility is <br /> to date incomplete. While the equipment will be adequate to heaVcool the entire building,ducting the heattair <br /> within the facility will be a County responsibility. <br /> When the programming information is conclusive,the County will proceed with the remaining upfit <br /> items, which include such things as constructing walls to create offices and classroom spaces, providing <br /> electrical outlets for specialized classroom areas, adding lighting as needed. The Landlord has indicated a <br /> willingness to provide a rent offset for a portion of the improvements made by the County at such time the <br /> County determines the cost estimate. <br /> The items of special consideration mentioned in#2 above have been addressed as follows: <br /> HVAC as mentioned earlier,is being completely replaced by the Landlord. The lease warranties its <br /> sufficiency. <br /> The restmoms were inadequate for both the type of usage we propose for the facility and the number <br /> of people which we anticipate would be in the building on a regular basis. The Landlord has agreed to <br /> construct the restroom facilities to address our needs. <br /> The Landlord indicates that the building roof does not teak presently and,aria the lease, assumes <br /> responsibility for repairs in the event leaking occurs during the term of the lease. it should further be noted, <br /> that the Landlord observed minor conditions in the block walls which could indicate moisture retention in the <br /> block and has voluntarily waterproofed the building at a cost of around$16,000. <br /> The Landlord indicates that the building is served with sufficient electrical service to address our needs <br /> as articulated to him thus far. The building was wired for a business whose electrical needs are likely to far <br /> exceed the capacity which we will need. However, it should be noted that in the absence of specific <br /> programming plans,the Landlord is unable to wire specific areas according to our needs at this time. He is, <br /> as indicated earlier,willing to provide a partial rent offset against our upfit investment,of which this work would <br /> be a part. <br /> Funds necessary for the balance of the 95-96 fiscal year include: <br /> Lease $26,986 <br /> Utilities(estimated) $ 3,300 <br /> Upfit $40,000 <br /> Total $70,286" <br /> ("Does not consider any offsets against rent for upfits made by County.) <br /> The Skill Development Center has been allocated $25,000 through the current year CIP. The Budget Staff <br /> indicates that the approximately$45,000 additional funds are available through the capital reserve account in <br /> the Capital Improvement Plan. <br /> 1996-97 fiscal year obligations are estimated as follows: <br /> Lease $99,240 <br /> Utilities $13,200 <br /> Total $112,440 <br /> Although we would continue to diligently pursue alternative funding sources,such as subleases with tenants <br /> or other program reimbursement opportunities, it must be presumed at this point that the funds would come <br /> directly through the County's budget or CIP. <br />