Orange County NC Website
� ,N T E R F�R �� Cardno 8 � <br /> '�:atEZSN,��1 ENTR/X <br /> P R OTECTI O H Shaping the Future <br /> Table 1.Scope of Work Associated with the UNRBA Nutrient Project(Credits,Tool,and Framework Issues) ' <br /> . � �. .�. - .- • .� <br /> a. Ideritify and Recommend attributes and quality levels based on CWP existing protocols;Ider�tify metrics to qualify Tier 1,2,3 measures I <br /> (include discussions with UNRBA/DWR,recognizing this translation to Tiers may change as the projec�progresses);Develop webinar for $9,841 73 <br /> UNRBA/DWR to discuss; Implement revised database structure I <br /> b. Background research to develop survey to evaluate implemerrtation poterrtial for measures(e.g.key stakeholder groups such as NRCS, $9,358 65 <br /> WOC, LG stormwater departmer�ts,DWR) <br /> c.GIS analysis(geology,stream networks,subbasins,etc.) $1,160 12 <br />' d. Develop and incorporate trapping/transformations in impoundments and streams $13,200 122 , <br /> e. Draft summary;incorporate comments;finalize summary of trapping $2,720 22 <br />' Subtotal-TasK 1.1 $36,278 294 <br /> a. Review and confirm list of 55 BMPs to review with UNRBA(e.g.clarify types of ineasures,add specifics needed to isolate a single measure) $1,066 8 I <br /> b.Preliminary research and data collection for 55 BMPs(literature review of peer and non-peer literature and other data sources) $12,070 89 <br /> c.Populate database with a subset of key attributes for each nutrient reduction measure $3,984 30 ' <br /> d.Assess quality of existing and new data sources $2,452 18 <br /> e. Develop survey to evaluate implementation potential for measures(e.g.key stakeholder groups such as NRCS,WOC, LG stormwater $2�382 21 <br /> departments,DWR) <br /> g. ImplemeM survey tool and compile results $3,224 24 � <br /> h.Analyze survey and screening level database to ider�tify 20 to 25 priority nutrient reduction measures $7,801 58 ! <br /> _ ---- <br /> — <br /> k.Incorporate input from UNRBA/DWR and finalize list of priority BMPs $2,132 16 <br /> -.— .. -- - _ <br /> _ :_ a- %, =_ _ - — _ -_-_ - <br /> _ � —_ — — — — <br /> Subtotal-Task 1.2 $50,000 376 <br /> I <br /> a.Additional research to complete database for 20-25 priority measures $10,536 76 <br /> b. Develop expert elicitation survey(e.g.,SWCD,NSAB BMP subcommittee,DWR)survey to fill in gaps where needed(local conditions, $��610 52 <br /> effectiveness,etc.) i <br /> d. Modify database based on expert elicitation $2,830 21 <br /> 0 <br />