Orange County NC Website
21 <br /> RENOVATIONS: Project No: _ 332_11 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations s.f. bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations 8,448 s.f. bldg. area X $32.00 per sq. ft. = $270,336 <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations $270,336 <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. _ <br /> 3 Water System (on-site system or to connect to county system) <br /> Sewer System (on-site system or to connect to county system) <br /> 5Asbestos Abatement $175,000 <br /> 6 Handicapped Accessibility $150,000 <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives 725,000 <br /> Building Code/Life Safety 150,000 <br /> Energy Conservation 115,000 <br /> Environmental <br /> Roof Replacement s.f. X $6.25 per sq. ft. = <br /> Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. = <br /> Security System <br /> New Main Electrical Service 400,000 <br /> Kitchen -equipment,serving line&dishwasher 105,000 <br /> sub total Other Renovations 1,495,000 <br /> SUB TOTAL 2,090,336 <br /> Administrative costs/fees 1 2,090,3361 const.cost. X 0.09 188,130 <br /> Total Renovation Cost 1 $2,278,466 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project Cost $3,976,081 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> 17 Building Code/Life Safety(explain below) Change in grade organization <br /> Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> Other(indicate) : Deferred Maintenance(see below) <br /> 2 Meet State or Federal mandate(see below) <br /> ADA <br /> Orange High School printed: 12/06/95 page 2 of 2 <br />