Orange County NC Website
15 <br /> RENOVATIONS: _ _ Project No: 328_1 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations s.f bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations <br /> 2Air Conditioning s.f bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4 Sewer System (on-site system or to connect to county system) <br /> SAsbestos Abatement $90,000 <br /> 6 Handicapped Accessibility $200,000 <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives 150,000 <br /> Building Code/Life Safety 80,000 <br /> Energy Conservation 65,000 <br /> Environmental <br /> Roof Replacement Is.f. X $6.25 per sq. ft. _ <br /> Computer Network/Ca I s.f. bldg. area X $1.75 per sq. ft. _ <br /> Security System <br /> New Main Electrical Service <br /> Kitchen-add dishwasher,equipment X serving line 95,000 <br /> sub total Other Renovations 390,000 <br /> SUB TOTAL 680,000 <br /> Administrative costs/fees 680,0001 const.cost. X 0.09 61,200 <br /> Total Renovation Cost $741,200 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project Cost $741,200 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> 17 Building Code/Life Safety(explain below) Change in grade organization <br /> Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> Other(indicate) : Deferred Maintenance(see below) <br /> 3 Meet State or Federal mandate(see below) <br /> ADA <br /> G.A. Brown Elementary printed: 12105195 page 2 of 2 <br />