Orange County NC Website
5 <br /> INDIVIDUAL.SCHOOL REPORT NEW ELEMENTARY <br /> 4996 PUBLIC SCHOOL FACILIIYNE�E*DS' 10 YEAR NEEDS ASSESSMENT <br /> Administrative Unit: Chapel Hill-Carrbora Schools Priority: 2 <br /> Unit No: 681 <br /> School Name: JElementary School #8 Grades : K-5 <br /> Name of School(s)this project replaces : Capacity <br /> Number of students: 600 (K-05)students Project no: 100_1 <br /> Future capacity • 600 <br /> Exceptional (self-contained): 2 classrooms Pre-kindergarten clrms: 1 <br /> Dance/Drama classrooms: 1 Year when needed: 1999 <br /> Land Cost/Acre: $15,625 On-site Sewer/Water(y/n): N <br /> Bldg.area to be demolished: sq.ft. <br /> Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 25 <br /> Sq.Ft. per Student(w/excp.): 114 Other Teaching Stations: 5 <br /> COST ESTIMATE <br /> Construction Cost 73,368 s.f. building area X $82.30 per sq. ft. _ $6,038,186 <br /> Middle School additional sitework (playfields,drives) 4%const. cost N/A <br /> High School additional sitework (fields,parldng,etc.) 7%const. cost N/A <br /> sub total $6,038,186 <br /> Construction Contingency construction cost X 0.05 contingency= 301,909 <br /> Administrative costs/fees construction cost X 0.07 422,673 <br /> sub total $6,762,768 <br /> Demolition of Exist. Buildings s.f building area X $6.86 per sq. ft. _ <br /> On-site sewer/water system <br /> Total Construction Cost $6,762,768 <br /> Land Acquisition 16 acres X $15,625 per acre= $250,000 <br /> Furnishings/Equipment 6,038,186 construction cost X 0.094 $569,640 <br /> Total Current Cost $7,582,408 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> ElReplace category IV or V facility 10 To accommodate projected enrollment <br /> 30 Replace mobile units with permanent facilities ❑2 Ease current crowding at schools <br /> Other(indicate) : F7 Change in grade organization <br /> Elementary School#8 printed: 12/13/95 <br />