Browse
Search
Agenda - 01-16-1996 - IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 01-16-1996
>
Agenda - 01-16-1996 - IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 11:59:51 AM
Creation date
10/15/2013 11:59:27 AM
Metadata
Fields
Template:
BOCC
Agenda Item
IX-A
Document Relationships
Minutes - 19960116
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> RENOVATIONS: . Project No: 3121 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations 3,875 s.f. bldg. area X $23.00 per sq. ft. = $89,125 <br /> T Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations $89,125 <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement $90,000 <br /> 6 Handicapped Accessibility $100,000 <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives 150,000 <br /> Building Code/Life Safety 80,000 <br /> Energy Conservation 65,000 <br /> Environmental <br /> Roof Replacement Is.f. X $6.25 per sq. ft. = <br /> Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. ft..= <br /> Security System <br /> New Main Electrical Service 175,000 <br /> Kitchen-equipment, serving line&dishwasher 75,000 <br /> sub total Other Renovations 545,000 <br /> SUB TOTAL 824,125 <br /> Administrative costs/fees I 824,125 const.cost. X 0.09 74,171 <br /> Total Renovation Cost 1 $898,296 <br /> 9 Land Acquisition acres X per acre= <br /> Total Current Project Cost $898,296 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> 1 Building Code/Life Safety(explain below) Change in grade organization <br /> F37 Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> Other(indicate) : Deferred Maintenance(see below) <br /> 2 Meet State or Federal mandate(see below) <br /> ADA <br /> Central Elementary printed: 12/06/95 page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.