Browse
Search
Agenda - 01-16-1996 - IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 01-16-1996
>
Agenda - 01-16-1996 - IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 11:59:51 AM
Creation date
10/15/2013 11:59:27 AM
Metadata
Fields
Template:
BOCC
Agenda Item
IX-A
Document Relationships
Minutes - 19960116
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 4 <br /> INDIVIDUAL SCHOOL REPORT NEW MIDDLE SCHOOL <br /> PUBLIC $CHO <br /> I OL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT <br /> Administrative Unit: Chapel Hill-Carrboro Schools Priority: 2 <br /> Unit No: 681 <br /> School Name: IMIddle School#4 Grades : 6-8 <br /> Name of School(s)this project replaces : Capacity <br /> Number of students: 700 (K-05)students Project no: 1011 <br /> Future capacity : 700 <br /> Exceptional (self-contained): 3 classrooms Pre-kindergarten cirms: N/A <br /> Dance/Drama classrooms: 1 Year when needed: 2000 <br /> Land Cost/Acre: $6,819 On-site SewerMater(y/n): N <br /> Bldg. area to be demolished: =sq.ft. <br /> Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 27 <br /> Sq.Ft. per Student(w/excp.): 140 Other Teaching Stations: 9 <br /> COST ESTIMATE <br /> Construction Cost 97,887 s.f. building area X $82.30 per sq. ft. _ $8,056,100 <br /> Middle School additional sitework (playfields,drives) 4%const. cost 322,244 <br /> High School additional sitework (fields,parking,etc.) 7%contt. cost N/A <br /> sub total $8,378,344 <br /> Construction Contingency construction cost X 0.05 contingency= 418,917 <br /> Administrative costs/fees construction cost X 0.07 586,484 <br /> sub total $9,383,745 <br /> Demolition of Exist. Buildings s.f. building area X $6.86 per sq. ft. _ <br /> On-site sewer/water system <br /> Total Construction Cost $9,383,745 <br /> Land Acquisition 22 acres X $6,819 per acre= $150,018 <br /> Furnishings/Equipment 8,056,100 construction cost X 0.094 $760,009 <br /> Total Current Cost $10,293,772 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility 1❑ To accommodate projected enrollment <br /> Replace mobile units with permanent facilities 2❑ Ease current crowding at schools <br /> El Other(indicate) : Change in grade organization <br /> Middle School#4 printed: 12/13/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.