Orange County NC Website
• <br /> 4 <br /> INDIVIDUAL SCHOOL REPORT NEW MIDDLE SCHOOL <br /> PUBLIC $CHO <br /> I OL FACILITY NEEDS 10-YEAR NEEDS ASSESSMENT <br /> Administrative Unit: Chapel Hill-Carrboro Schools Priority: 2 <br /> Unit No: 681 <br /> School Name: IMIddle School#4 Grades : 6-8 <br /> Name of School(s)this project replaces : Capacity <br /> Number of students: 700 (K-05)students Project no: 1011 <br /> Future capacity : 700 <br /> Exceptional (self-contained): 3 classrooms Pre-kindergarten cirms: N/A <br /> Dance/Drama classrooms: 1 Year when needed: 2000 <br /> Land Cost/Acre: $6,819 On-site SewerMater(y/n): N <br /> Bldg. area to be demolished: =sq.ft. <br /> Construction Cost/sq.ft.: $82.30 Number of Academic Classrooms: 27 <br /> Sq.Ft. per Student(w/excp.): 140 Other Teaching Stations: 9 <br /> COST ESTIMATE <br /> Construction Cost 97,887 s.f. building area X $82.30 per sq. ft. _ $8,056,100 <br /> Middle School additional sitework (playfields,drives) 4%const. cost 322,244 <br /> High School additional sitework (fields,parking,etc.) 7%contt. cost N/A <br /> sub total $8,378,344 <br /> Construction Contingency construction cost X 0.05 contingency= 418,917 <br /> Administrative costs/fees construction cost X 0.07 586,484 <br /> sub total $9,383,745 <br /> Demolition of Exist. Buildings s.f. building area X $6.86 per sq. ft. _ <br /> On-site sewer/water system <br /> Total Construction Cost $9,383,745 <br /> Land Acquisition 22 acres X $6,819 per acre= $150,018 <br /> Furnishings/Equipment 8,056,100 construction cost X 0.094 $760,009 <br /> Total Current Cost $10,293,772 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility 1❑ To accommodate projected enrollment <br /> Replace mobile units with permanent facilities 2❑ Ease current crowding at schools <br /> El Other(indicate) : Change in grade organization <br /> Middle School#4 printed: 12/13/95 <br />