Orange County NC Website
53 <br /> RENOVATIONS: Project Nu: 31624 <br /> No. Size/Amount Uni'Cest Total <br /> 1 Genaral Renovations <br /> Minor Renovations s.f. bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations s.f. bldg. area X $$2.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> subtotal General Renovations <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives 75,000 <br /> Building Code/Life Safety <br /> Energy Conservation 125,000 <br /> Environmental <br /> Roof Replacement I 8,000 s.f. X $6.25 per sq. ft. = 50,000 <br /> Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. = <br /> Security System <br /> New Main Electrical Service <br /> sub total Other Renovations 250,000 <br /> SUB TOTAL 250,000 <br /> Administrative costs/fees 1 250,0001 const.cost. X 0.09 22,500 <br /> Total Renovation Cost $272,500 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project Cost $272,500 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> Building Code/Life Safety(explain below) Change in grade organization <br /> 1 Energy Conservation/Air Conditioning <br /> For reduced class sizes = Provide for technology(infrastructure) <br /> Other(indicate) : F-2 ] Deferred Maintenance(see below) <br /> Meet State or Federal mandate(see below) <br /> Frank Porter Graham Elementary printed: 12/14/95 page 2 of 2 <br />