Browse
Search
Agenda - 01-16-1996 - IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 01-16-1996
>
Agenda - 01-16-1996 - IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2013 11:59:51 AM
Creation date
10/15/2013 11:59:27 AM
Metadata
Fields
Template:
BOCC
Agenda Item
IX-A
Document Relationships
Minutes - 19960116
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
51 <br /> RENOVATIONS: _ Project No: 312_23 <br /> No. Site/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations s.f. bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations _ s.f bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4 Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site DevelopmentlParking/Drives <br /> Building Code/Life Safety 40,000 <br /> Energy Conservation <br /> Environmental <br /> Roof Replacement 29,000 s.f. X $6.25 per sq. ft. = 181,250 <br /> Computer Network/Cabling s.f bldg. area X $1.75 per sq. ft. = <br /> Security System <br /> New Main Electrical Service <br /> sub total Other Renovations 221,250 <br /> SUB TOTAL 221,250 <br /> Administrative costs/fees 221,250 const.cost. X 0.06 19,913 <br /> Total Renovation Cost $241,163 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project Cost $241,163 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> (� Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> 17 Building Code/Life Safety(explain below) Change in grade organization <br /> F27 Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> Other(indicate) : Deferred Maintenance(see below) <br /> Meet State or Federal mandate(see below) <br /> Estes Hills Elementary printed: 12/14/95 page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.