Orange County NC Website
47 <br /> RENOVATIONS: Project No: 30421 <br /> No. Size/Amount Unit Cost Total <br /> 1 General kenovations <br /> Minor Renovations s.f. bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> 7 Other: <br /> Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives <br /> Building Code/Life Safety 35,000 <br /> Energy Conservation 125,000 <br /> Environmental <br /> Roof Replacement I 22,000 s.f. X $6.25 per sq. ft. = 137,500 <br /> Computer Network/Cabling s.f. bldg. area X $1.75 per sq. ft. _ <br /> Security System <br /> New Main Electrical Service <br /> sub total Other Renovations 297,500 <br /> SUB TOTAL 297,500 <br /> Administrative costs/fees 297,500 const.cost. X 0A9 26,775 <br /> Total Renovation Cost $324,275 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project_Cost $324,275 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> Building Code/Life Safety(explain below) Change in grade organization <br /> F17 Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> 0 Other(indicate) : Deferred Maintenance(see below) <br /> Replacement/updating/facility <br /> Meet State or Federal mandate(see below) <br /> Carrboro Elementary School printed: 12114195 page 2 of 2 <br />