Orange County NC Website
? 3AV.161 i994l __4MW ix�4 <br /> , 1 <br /> 3 <br /> SCHOOL CAPITAL CONSTRUCTION STUDY COMMISSION - SURVEY <br /> 9911 PUBLIC 10-YEAR NEEDS ASSESSMENT <br /> ADMINISTRATIVE UNIT: Chapel Mill-Carrboro Schools UNIT NO: 681 <br /> STUDENT POPULATION PROJECTIONS <br /> GR. K-5 GR.6-8 GR.9-12 EXC+TMH Totals <br /> FINAL ADM 1994-95 : 1 3,6511 1,747 1,998 113 7509 <br /> DPI Membership Projections : <br /> (fill-in) 1999-2000: 4037 2281 2648 115 9081 <br /> 2004-05: 3950 2420 3400 115 9885 <br /> Local Unit Membership Projections(Y or N)� <br /> NOTE: Do not fill-in with local membership projections unless they are significantly different from DPI projections <br /> Attach explanation if local projections are used. <br /> CAPACITY OF FACILITIES (no. of students) <br /> (Do not include capacity of mobile units or temporary structures) <br /> Elementary Middle/Jr.Hi_ High Totals <br /> Capacity of Existing Schools : 3092 210 16"1 6841 <br /> Now under construction or funded : 5961 1 1020 1616 <br /> (additional capacity of new schools or additions) <br /> Total 3688 2104 2665 8457 <br /> Additional Capacity from Projects included in this report: <br /> Added Capacity 1996-2004: 6001 700 500 1800 <br /> Total Capacity 2004-05: 1 42881 280 3165 10257 <br /> MOBILE UNITS and TEMPORARY BUILDINGS <br /> Indicate the TOTAL number of mobile units and temporary buildings now used for EDUCATIONAL programs <br /> (classrooms, exceptional children, resource, art, music, etc.) 21 <br /> TOTAL ESTIMATE FOR ALL PROJECTS NEEDED: <br /> CURRENT COST : $ 39,453,217 <br /> IN YEARS NEEDED (incl inflation) : $ 44,535,771 <br /> Summary Reports -page 1 PRINTED: 14-Dec-95 <br />