Orange County NC Website
15 <br /> RENOVATIONS: . Project No: 3105 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations s.f. bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4 Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives <br /> Building Code/Life Safety <br /> Energy Conservation <br /> Environmental <br /> Roof Replacement I Is.f. X $8.25 per sq. ft. = <br /> Computer Network/Cabling 1 58,0001 s.f. bldg. area X $1.75 per sq. ft. = 101,500 <br /> Security System <br /> New Main Electrical Service <br /> Replace 12 four ton electric heat ventilators 75,000 <br /> sub total Other Renovations 176,500 <br /> SUB TOTAL 176,500 <br /> Administrative costs/fees 176,5001 const.cost. X 0.09 15,885 <br /> Total Renovation Cost $192,385 <br /> 9 Land Acquisition acres X per acre= <br /> Total Current Project Cost $192,385 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> Building Code/Life Safety(explain below) Change in grade organization <br /> 117 Energy Conservation/Air Conditioning <br /> For reduced class sizes F-2 I Provide for technology(infrastructure) <br /> Other(indicate) : F-3 Deferred Maintenance(see below) <br /> Most State or Federal mandate(see below) <br /> Seawell Elementary printed: 12/13/95 page 2 of 2 <br />