Orange County NC Website
RENOVATIONS: Project No: soa 29 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations s.f bldg. area X $23.00 per sq. ft. = <br /> Moderate Renovations s.f bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f. bldg. area X $49.00 per sq. ft. = <br /> subtotal General Renovations <br /> 2Air Conditioning s.f. bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4 Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> $35,000 <br /> 7 Other: <br /> Demolition of Exist.Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives 15,000 <br /> Building Code/Life Safety <br /> Energy Conservation <br /> Environmental <br /> Roof Replacement Is.f. X $6.25 per sq. ft. _ <br /> Computer Network/Cabling 62,0001 s.f. bldg. area X $1.75 per sq. ft: = 108,500 <br /> Security System <br /> New Main Electrical Service <br /> sub total Other Renovations 123,500 <br /> SUB TOTAL 158,500 <br /> Administrative costs/fees 1 158,5001 const.cost. X 0.09 14,265 <br /> Total Renovation Cost T $172,765 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project Cost $172,765 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility To accommodate projected enrollment <br /> Replace mobile units with permanent facilities Ease current crowding at schools <br /> Building Code/Life Safety(explain below) Change in grade organization <br /> Energy Conservation/Air Conditioning <br /> For reduced class sizes 0 Provide for technology(infrastructure) <br /> Other(indicate) : 0 Deferred Maintenance(see below) <br /> 1 Meet State or Federal mandate(see below) <br /> Carrboro Elementary School printed: 12/14/95 page 2 of 2 <br />