Orange County NC Website
7 <br /> RENOVATIONS: Project No: 99911 <br /> No. Size/Amount Unit Cost Total <br /> 1 General Renovations <br /> Minor Renovations 3,500 s.f. bldg. area X $23.00 per sq. ft. = $80,500 <br /> Moderate Renovations s.f. bldg. area X $32.00 per sq. ft. = <br /> Major Renovations s.f bldg. area X $49.00 per sq. ft. = <br /> sub total General Renovations $80,500 <br /> 2A1r Conditioning s.f bldg. area X $12.00 per sq. ft. = <br /> 3 Water System (on-site system or to connect to county system) <br /> 4Sewer System (on-site system or to connect to county system) <br /> 5 Asbestos Abatement <br /> 6 Handicapped Accessibility <br /> 7 Other: <br /> Demolition of Exist. Buildings s.f. bldg. area X $6.86 per sq. ft. _ <br /> Site Development/Parking/Drives <br /> Building Code/Life Safety <br /> Energy Conservation <br /> Environmental <br /> Roof Replacement IS1 X $6.25 per sq. ft. _ <br /> Computer Network/Cabling I s.f. bldg. area X $1.75 per sq. fL _ <br /> Security System <br /> New Main Electrical Service <br /> Athletic fields, bleachers,tennis courts, press box 225,000 <br /> sub total Other Renovations 225,000 <br /> SUB TOTAL 305,500 <br /> Administrative costs/fees 305,5001 const.cost. X 0.09 27,495 <br /> Total Renovation Cost $332,995 <br /> 911-and Acquisition acres X per acre= <br /> Total Current Project.Cost $10,452,361 <br /> Why is this project needed? MARK IN RANKED ORDER FOR THOSE THAT APPLY <br /> Replace category IV or V facility � To accommodate projected enrollment <br /> Replace mobile units with permanent facilities r 3—] Ease current crowding at schools <br /> Building Code/Life Safety(explain below) Change in grade organization <br /> Energy Conservation/Air Conditioning <br /> For reduced class sizes Provide for technology(infrastructure) <br /> 1 Other(indicate) : Deferred Maintenance(see below) <br /> Complete original Ed.Spec. requirement <br /> Meet State or Federal mandate(see below) <br /> East Chapel Hill High printed: 12/13/95 page 2 of 2 <br />