Orange County NC Website
M <br />for possible rock. The topography of the neighborhood is complex and the land falls in <br />several different directions. This concept plan does not include the costs of any property <br />acquisitions or easement acquisitions. The availability hookup charge for each of the <br />parcels is based on an assumed average house size of 2,500 square feet. When a <br />customer connects to the OWASA water and sewer system, there is a one -time fee that <br />is estimated to be $4,300 per parcel for the concept plan. <br />Cost estimate Summary: <br />Engineering, Design and Permitting <br />376,350 <br />Construction Cost <br />3,763,506 <br />Construction Administration <br />188.175 <br />Construction Inspection <br />188,175_ <br />20% Contingency <br />903,241 <br />Sub Total <br />5,419,447 <br />Service Availability Fees <br />368,768 <br />Total <br />5,788,215 <br />The concept does not include the cost to actually connect individual homes to the sewer <br />system. Those costs will vary depending on the configuration of the lot and the distance <br />from the house to the main sewer line. Those costs are typically the costs of the <br />homeowner and are estimated to be about $20 1foot. The connections to an individual <br />house would be provided by a private plumbing contractor. <br />Z <br />