37 <br />have not connected. The 86 parcels in yellow are the properties that would be served <br />by the conceptual sewer layout. The concept map also breaks down the sewer service <br />into 8 sub -areas with the number of parcels served and cost per parcel. The 8 red lines <br />represent the possible sub -areas of the sewer infrastructure that could be considered, if <br />the entire concept project is not feasible. The sewer infrastructure routing was estimated <br />based on the topography taken from maps rather than from any field work. In 'Order to <br />get to a greater level of detail or certainty- on the cost, some field work would be <br />required. There are two brown areas on the map that the County has identified as some <br />subsurface disposal or some suspected contamination. Without any further <br />investigation, the sewer line has been routed no closer than 100 feet of that margin. <br />Exhibit 2 <br />The total construction and installation cost for the sewer concept is current estimated to <br />be $5.8 million. See the table below. It would serve 86 additional parcels of land. The <br />concept costs include construction, engineering design, administration and contingency <br />5 <br />