Browse
Search
Agenda - 10-17-2013 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 10-17-2013 - Joint Mtg. - Carrboro Bd. of Alderman
>
Agenda - 10-17-2013 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 10:52:19 AM
Creation date
10/14/2013 10:06:59 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2013
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 10-17-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br />have not connected. The 86 parcels in yellow are the properties that would be served <br />by the conceptual sewer layout. The concept map also breaks down the sewer service <br />into 8 sub -areas with the number of parcels served and cost per parcel. The 8 red lines <br />represent the possible sub -areas of the sewer infrastructure that could be considered, if <br />the entire concept project is not feasible. The sewer infrastructure routing was estimated <br />based on the topography taken from maps rather than from any field work. In 'Order to <br />get to a greater level of detail or certainty- on the cost, some field work would be <br />required. There are two brown areas on the map that the County has identified as some <br />subsurface disposal or some suspected contamination. Without any further <br />investigation, the sewer line has been routed no closer than 100 feet of that margin. <br />Exhibit 2 <br />The total construction and installation cost for the sewer concept is current estimated to <br />be $5.8 million. See the table below. It would serve 86 additional parcels of land. The <br />concept costs include construction, engineering design, administration and contingency <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.