Orange County NC Website
19 <br />Exhibit 5 <br />The 2012 Sewer concept presented by OWASA had a total estimated cost of $5.8 <br />million that would serve 86 parcels, with an average cost of $67,000 per parcel. The <br />Proposed Utility District which evolved from the 2012 Sewer concept has an estimated <br />total cost of $17.6 million. With an expanded service area, the cost of sewer only is <br />$11.6 million. If the sewer component of the Proposed Utility District is broken out, <br />sewer would serve 220 sewer parcels, with an average cost of $53,131 per parcel. <br />13 <br />