Orange County NC Website
Proposed Utility District <br />Total Water Cost <br />Construction Cost <br />Engineering, Design and Permitting 10% <br />Construction Administration 5% <br />Construction Inspection 5% <br />20% Contingency <br />Sub Total <br />Service Availability Fees <br />Meter Cost <br />Total <br />Number of parcels served 132 <br />Cost Per Parcel <br />Exhibit 4 <br />17 <br />$ 3 <br />3,835,724 <br />$ 3 <br />383,572 <br />$ 1 <br />191,786 <br />$ 1 <br />191,786 <br />$ 9 <br />920,575 <br />$ 5 <br />5,523,443 <br />$ 4 <br />441,408 <br />$ 2 <br />26,400 <br />$ 5 <br />5,991,251 <br />45,388 <br />Na <br />�■■� +�� / / /r1 MALA <br />Will <br />OVER IN <br />11 <br />