Orange County NC Website
M <br />Attachment 1 <br />ORANGE COUNTY TRANSPORTATION PRIORITY LIST <br />2014— 2020 TRANSPORTATION IMPROVEMENT PROGRAM <br />FOR THE REGIONAL PRIORITY LIST OF <br />THE TRIANGLE AREA RURAL PLANNING ORGANIZATION <br />1. Dairyland Road /Orange Grove Road /Buckhorn Road bicycle facilities. construct 4 -ft. <br />paved shoulders along the following route from Carrboro to West Ten Road to <br />provide a connection with proposed routes to Mebane and Elfand. <br />• TIP Project EB -5108: Dairyland Road (SR 1112 - SR 1113 — SR 1177) from <br />Union Grove Church Road to Orange Grove Road (SR 1006); <br />• Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn <br />Road (SR 1114); and <br />• Buckhorn Road (SR 1114) to West Ten Road (SR 1144). <br />This route would extend bicycle facilities proposed in concert with highway <br />improvements on Buckhorn Road Road (SR 1114) to provide a connection through <br />western Orange County from Carrboro to the Buckhorn Road /Interstate 85 <br />Economic Development District and US 70 near Mebane. This route is listed in <br />Orange County's Bicycle Transportation Plan as a secondary priority bicycle route <br />connecting southern Orange County with the western portion of its number 2 primary <br />priority bicycle route on West Ten Road (SR 1148). Project EB -5108 schedules a <br />portion of this route, Dairyland Road from Union Grove Church Road to Orange <br />Grove Road, for a feasibility study. Orange County recommends that the feasibility <br />study also include the segment of Dairyland Road from Union Grove Church Road <br />(SR 1111) to Old NC 86 to connect to proposed bicycle facilities on Old NC 86 <br />along Carrboro's ETJ. <br />2. SR 1005 (Old Greensboro Road) bicycle facility: Add 4 -ft. paved shoulders on Old <br />Greensboro Road from Carrboro's ETJ to the Orange /Alamance County line. This <br />route is the number 3 primary priority of the Orange County Bicycle Transportation <br />Plan, and would enhance bicycle transportation between southwestern Orange <br />County and Carrboro /Chapel Hill. This project is a segment of the Mountains to Sea <br />Bicycle Route. <br />3. Orange Grove Road bicycle facilities: Construct 4 -ft. paved shoulders along Oranqe <br />Grove Road (SR 1006) from Interstate 40 to Dodson's Crossroads (SR 1102). This <br />route would provide bicycle facilities to the Grady Brown Elementary School and <br />Cedar Ridge High School from the area south of the schools and connect to a <br />proposed bicycle facility on Orange Grove Road into Hillsborough. <br />4. Dodson's Crossroad bicycle facilities: Construct 4 -ft. paved shoulders along <br />Dodson's Crossroads (SR 1102) from Orange Grove Road (SR 1006) to Dairyland <br />Road (SR 1177). This route would provide bicycle facilities from the Chapel Hill - <br />Carrboro area to connect to a proposed bicycle facility on Orange Grove Road into <br />Hillsborough. <br />