Orange County NC Website
12 <br />EXHIBIT "A" <br />PROJECT UNDERSTANDING for "WILSON INDUSTRIAL PARKWAY" SURVEYING <br />AND ENVIRONMENTAL <br />SCOPE of SERVICES <br />Surveying <br />1. Prepare a 200 foot wide by approximately 2,500 foot long topographic route <br />survey for the proposed roadway with one (1) foot contours tied to North Carolina <br />State Plane coordinate system. <br />2. Provide topographic survey of Ben Wilson Road 200 foot to the west and south <br />of the proposed intersection with the new roadway. <br />3. Prepare a topographic survey of Ben Wilson Road west to Connolly Trace for <br />preparing water line plans and profiles. <br />4. Prepare a topographic survey of the proposed 1,500 linear feet sewer line route <br />for preparing sewer line plans and profiles. <br />5. Locate existing property boundaries (three parcels) and NCDOT right -of -ways on <br />the map. <br />6. Survey will show existing utilities as located by NC One Call. <br />7. Locate and show on the survey, delineated streams and wetlands along the <br />proposed roadway route, sewer line route, and along the south side of the <br />proposed industrial site, and prepare a metes and bounds survey. <br />8. Prepare Right -of -Way plats for the new roadway for recordation with Orange <br />County as necessary. <br />9. Prepare easement maps for the proposed sewer line for acquisition of <br />easements by Orange County. <br />10. Set required property pins for the new right -of -way plat. <br />Geo- Technical Testing <br />1. Conduct soil investigations, including drilling and testing soil borings based on <br />NCDOT standards spaced at 200 feet, minimum with 2 borings in cut locations. <br />2. Install piezometers in cut area borings for 24 hour groundwater readings. <br />