Browse
Search
Agenda - 10-15-2013 - 5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 10-15-2013 - Regular Mtg.
>
Agenda - 10-15-2013 - 5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 10:43:02 AM
Creation date
10/14/2013 9:11:08 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes 10-15-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
ORD-2013-036 Ordinance approving Budget Amendment #2-A and Upper Neuse River Basin Assoc. Funding Request
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER FOR <br />! alklEZSP..ES <br />PROTECTION <br />Cardno <br />ENTR /X <br />Shaping the Future <br />e. QA data entries, revise as needed <br />$4,384 <br />32 <br />Subtotal - Task 1.3 <br />$26,400 <br />189 <br />1.4 Assessment of design parameters in credit estimation (specifications will be limited based on the available data) <br />a. Meeting with UNRBA /DWR to discuss lessons learned from PTRC process regarding design parameters <br />$520 <br />4 <br />b. Review of design parameters within database for each measure <br />$4,820 <br />35 <br />c. Develop recommendations for assessing impacts of specifications based on the database <br />$3,160 <br />20 <br />d. Develop webinar to discuss recommendations with UNRBA /DWR <br />$2,200 <br />16 <br />e. Incorporate input and analyze impacts of key design parameters within a BMP class when data are available (e.g., minimum implementation <br />requirements) <br />$5,060 <br />38 <br />f. Draft summary of design parameters or minimum implementation requirements <br />$6,306 <br />46 <br />g. Conference call with UNRBA/DWR to discuss draft text <br />$840 <br />6 <br />h. Finalize documentation and include in Task 1 memo <br />$1,160 <br />10 <br />Subtotal - Task 1.4 <br />$24,066 <br />175 <br />1.5 Statistical analyses <br />a. Review of statistical methods (e.g., provided by City of Durham, urban BMP database methods, etc.) <br />$3,580 <br />23 <br />b. Review of data (reformatting for stats program, exploratory analyses, identification of potential analysis methods) <br />$7,840 <br />56 <br />c. Develop recommendations for analytical methods based on a few example practice types <br />$2,060 <br />14 <br />d. Develop webinar for UNRBA/DWR to discuss recommended methods and example results <br />$1,680 <br />12 <br />e. Incorporate input from UNRBA /DWR and analyze datasets <br />$5,060 <br />38 <br />f. Draft summary of statistical analyses and outcomes <br />$4,026 <br />30 <br />g. Webinar to present results <br />$1,680 <br />12 <br />h. Finalize documentation and include in Task 1 memo <br />$2,320 <br />18 <br />Subtotal - Task 1.5 <br />$28,246 <br />203 <br />1.6 Complete Task 1 Memo and provide database <br />a. Compile cost estimates for priority measures <br />$7,382 <br />56 <br />b. Summarize costs and credits and translate (draft recommendations) to DWR quality Tiers <br />$4,770 <br />36 <br />c. Finalize draft and discuss with UNRBA/DWR on a webinar <br />$7,754 <br />56 <br />d. Incorporate comments and finalize Task 1 Memo. Provide electronic copy to UNRBA/DWR <br />$2,525 <br />20 <br />e. Deliver electronic database to UNRBA /DWR <br />$260 <br />2 <br />Subtotal - Task 1.6 <br />$22,691 <br />170 <br />TOTAL -TASK 1 <br />$187,681 <br />1,407 <br />
The URL can be used to link to this page
Your browser does not support the video tag.