Orange County NC Website
CENTER FOR <br />IAIAIEZSN,E�1 <br />PROTECTION <br />�� Cardn'o <br />ENTR /X <br />Shaping the Future <br />will come from Task 2.2 which is an optional subtask to develop the calculation tool(s) that are <br />selected under Task 2.1. The scope of work associated with task 2.2 will be developed with this <br />budgetary constraint pending the outcome of task 2.1. <br />o The budget for Task 2 assumes that a technical memorandum will be provided regarding the <br />development of the customized tool(s) for this watershed. This scope does not include <br />development or revisions to existing user's manuals. <br />• Based on the meeting held in Raleigh, NC on August 28th, 2013, Subtask 3.1 will be part of the official <br />contract. Subtasks 3.2, 3.3, and 3.4 will be optional subtasks. <br />• The credit tool will not be updated to account for carbon under this proposed scope (this would be an <br />optional task that requires additional budget). <br />• Stream transformations and trapping in impoundments will be estimated using pre - developed empirical <br />methods. <br />• Weekly calls between the project managers and monthly calls among the team are covered in the hours <br />allocated for technical work. <br />A draft schedule is provided in Figure 1. Optional subtasks are shown with blue, hatched bars. <br />