Browse
Search
Agenda - 10-15-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 10-15-2013 - Regular Mtg.
>
Agenda - 10-15-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 10:10:17 AM
Creation date
10/14/2013 9:00:04 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 10-15-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 1 • Annual Payroll, w/ benefits: $3.4 million <br /> 2 • Facility Size & Type: 120,000 sq. ft. <br /> 3 • Type of Operation: Production of fruit flavored candy snack "Hi-Chew" <br /> 4 • Site Size: 21.00 acres (Buckhorn Economic Development District) <br /> 5 <br /> 6 Although the Company has not committed to making any additional investment at this time, we anticipate a <br /> 7 plant expansion of equal size may eventually occur, since the property is large enough to accommodate an <br /> 8 idential "Phase Two" expansion. Company comments also support this long-term growth plan. <br /> 9 <br /> 10 <br /> 11 <br /> 12 Site Location in the Buckhorn Economic Development District: <br /> 13 • The 21.00 acre tract is part of the "W. H. Wilson Family Investment Group LLC" property, PIN # <br /> 14 9824459890. Located adjacent to Ben Wilson Road, south of and facing Interstate 1-40/1-85, and <br /> 15 near the Orange/Alamance county line in the City of Mebane. Site is part of a cleared 57-acre field <br /> 16 facing the highway, and opposite the Armacell facility and Tanger Mall. <br /> 17 <br /> 18 • Site is located within the County's "Buckhorn Economic Development District" and was rezoned by <br /> 19 the BOCC in 2012 to O/1 (Office/Institutional) to promote business recruitment. Site is currently <br /> 20 undeveloped without infrastructure. The owner is in the process of applying to the City of Mebane <br /> 21 to have this property annexed and rezoned. <br /> 22 <br /> 23 • The utility infrastructure and road access improvements required to the make Orange County's site <br /> 24 competitive to attract Project Rainbow will also make adjacent properties in the Buckhorn Economic <br /> 25 Development District more developable, attractive and competitive to appeal to future business <br /> 26 prospects. <br /> 27 <br /> 28 • In comparison, Project Rainbow's other finalist location, near Atlanta, offered the company a lower- <br /> 29 priced and established business park with all required infrastructure and tenants already in place, <br /> 30 thereby giving the company a greater comfort level as it evaluated advantages (incentives, business <br /> 31 costs, logistics, etc.) between that location and Orange County's largely undeveloped site. <br /> 32 <br /> 33 Site Location in the Buckhorn Economic Development District: <br /> 34 • The N. C. Department of Commerce has pre-qualified Project Rainbow and Orange County as <br /> 35 eligible co-applicants to receive a grant up to $750,000 from the State of North Carolina's <br /> 36 "Community Development Block Grant" (CDBG) industrial program. This State grant will <br /> 37 reimburse the County for 75% of the required water & sewer extension costs, and the <br /> 38 preliminary engineering for the access road to the site, with Orange County providing a <br /> 39 required 25% local match for the remaining cost. The estimated total cost to extend water <br /> 40 and sewer to the site, and design the road improvement may be approximately$700,000, but <br /> 41 the County's portion will be only 25% of that amount with the CDBG's reimbursement <br /> 42 assistance. <br /> 43 <br /> 44 • One of the criteria specific to the CDBG program is that among the total number of jobs Morinaga <br /> 45 commits to create in the first 3 years, at least 60% of those 90 — 120 total jobs must directly relate to <br /> 46 persons who are qualified as coming from low or moderate incomes, prior to coming to work for the <br /> 47 company. This population is typically a County resident who is either unemployed or <br /> 48 underemployed, and who has an income level at, or below 80% of the County's median income. <br /> 49 This is the same criteria as used by the County's affordable housing department to qualify low and <br /> 50 moderate income residents for Section 8 housing vouchers. Morinaga's projected average salary of <br /> 51 $37,969 will meet this requirement. <br /> 52 <br /> 53 • The cost to extend a 12" water line a distance of 3,700 linear feet to the site is estimated at <br /> 54 $375,000 and the cost to extend a 10" sewer line a distance of 1,500 linear feet to the site is <br />
The URL can be used to link to this page
Your browser does not support the video tag.