Orange County NC Website
Reports and Documentation <br /> Following the completion of field survey, the Project Coordinator will be provided with a <br /> Management Summary(Preliminary Field Report) detailing the results of the background research and field <br /> survey. If requested, ACC's Principal Investigator will meet with him/her in person to discuss these results. <br /> The draft report will follow the format specified in the Guidelines for Preparation of Archaeoligcal <br /> Survey Reports, available through the OSA. Its content will include a description of past archaeological <br /> research in the project vicinity, a discussion of local culture history(including historic landscape alterations), <br /> the field methods employed, evaluation methods, findings, conclusions, and recommendations. This <br /> document will also include detailed descriptions,maps,and photographs of all resources identified. <br /> A preliminary draft report will be submitted to the Project Coordinator for review. After addressing <br /> the Project Coordinator's comments (if any),ACC will submit four bound copies and one digital format copy <br /> of the revised final report to Orange County. <br /> Proposed Schedule <br /> ACC is aware of the need for the expeditious completion of this investigation. Table 1 shows ACC's <br /> anticipated schedule for this project. A hypothetical date of 4 September 2013 is used for receipt of the <br /> Notice to Proceed(NTP). Completion of this project, from receipt of a NTP to submission of the curation <br /> package, is estimated to take approximately one month(33 days), and be completed well before the October <br /> 18,2013 dealine. <br /> Table 7. Projected Work Sequence. <br /> Activity Be in Date Projected Completion Date <br /> Pre-Work Meeting/NTP September 4,2013 - <br /> Background Research September 5,2013 September 5,2013 <br /> Fieldwork September 6,2013 September 6,2013 <br /> Management Summary September 6,2013 September 7,2013 <br /> Site Forms September 6,2013 September 9,2013 <br /> Draft Report September 6,2013 September 20,2013 <br /> Review Period(1 week from submission of September 23,2013 September 27,2013 <br /> draft report) <br /> Final Report September 30,2013 October 4,2013 <br /> 33 days <br /> Delivery of Curation Package by October 11,2013 <br /> (contingent on OSA scheduling) <br /> Completion o Project <br /> 5 <br />