Browse
Search
2013-400 SW - American Industrial Contractors Inc to Inspect and maintain HVAC system $2,400
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-400 SW - American Industrial Contractors Inc to Inspect and maintain HVAC system $2,400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2013 12:04:26 PM
Creation date
10/7/2013 12:04:24 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-400 Solid Waste - American Industrial Contractors Inc to Inspect and maintain HVAC System $2,460
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICM <br /> INDUSTRIAL CONTRACTORS, INC. Serving the Triad since 1987 <br /> PO Box 16224•Greensboro, NC 27416• (336) 855-3301 <br /> Customer: Orange County Solid Waste <br /> Agreement#: ORANGE13 <br /> Condensing Units <br /> 1. Quarterly Maintenance Procedures <br /> a. Check unit for refrigerant leaks <br /> b. Check and calibrate safety controls and overloads <br /> C. Check main starter <br /> d. Check oil level(if applicable) <br /> e. Tighten motor and control panel terminals <br /> f. Check crankcase heater <br /> g. Check external interlocks <br /> h. Lubricate fan bearings <br /> i. Inspect and adjust belt alignment and tension(replace belt as needed) <br /> j. Check damper operation <br /> 2. Semi-Annual Maintenance Procedures <br /> a. Clean condenser coils; Spring&Fall <br /> 3. Written Documentation <br /> a. Record location of any leaks and type of repair <br /> b. Record compressor motor amp readings <br /> C. Record crankcase heater readings <br /> d. Record refrigerant pressures,temperatures, super heat and subcooling <br />
The URL can be used to link to this page
Your browser does not support the video tag.