Orange County NC Website
Piedmont Food and Ag.Processing Facility(PFAP) updated 1/232012 <br /> project code 10043 <br /> $301,869 MUNIS Update 11198010 <br /> SF 10440 <br /> 41.023,500$1SF 11839 <br /> Summary Revenues <br /> NC ADFP $132,000 35410.619947.00-449221-10043 <br /> TTF,RAFT Grants $479,000 479000 356108100.0740449222-10043 <br /> RAM Grant $211,819 <br /> Golden Leaf Foundation $250,000 358108100-07-00449223.10043 <br /> HUD Economic Day.Initiative $237,500 35.610.6100.07-004"712.10043 <br /> NC Specialty Crops Block Grant from USDA $79,950 35810-8100-07-00449235100" <br /> EECBG Transportation Grant $193,100 35.610810087-00449224.10043 <br /> Deduct of Operations Funds(from Tobacco Trust Fund) $75,000 <br /> Total Funds Available $1,325,369 <br /> Rem Cost SubTotal Liquidate <br /> Construction-6135700361180000.10043: <br /> 1. General Construction Bid date 4113M0;BOCC Award 6715110 Modando Cost. 725,670 x <br /> 76,800 x <br /> $02,470 <br /> Asbestos Abatement EHG 1,350 x <br /> 1,350 <br /> CO1-Base 9b closeout <br /> PCOt Insulation Subsl9utbn -4,929 x <br /> PCO2 Additional site sign Owner 553 x - <br /> PC04R Ventkg per 1.3 Designer 5,015 x <br /> PCOS Canopy Footings Designer 1,263 x <br /> PCOS Reseving Door Designer 468.x <br /> PCOGI Ronf curb su pports Designer 1,539 x <br /> PCO18 Dumpster gale rebuild per Sold Waste Inspections 3,070 x <br /> PCO20 Light Level Adjustments In pections 689 x <br /> PCO21 Move-in Dumpsters Owner 1,488 x <br /> PCO22 Credit for Duke Connection Fees,Hbm W&S Foes 22,690 x <br /> CO2-Cold Chain,Oemer Equipment Convection 43,536 <br /> PCO14 Electrical Connection for CooledFreezer package-panel to disconnect 8,566 x <br /> PCO15 Freezer Floor Slab w7Epmy 19,934 x <br /> PCO16 Electrical Connection for CooledFreeter package-disconnect to units 9,280 x <br /> PCO17 Used Fryer Elwi,var Connections 4,344 x <br /> 40,125 <br /> Protassional Services-613570035.870000-10043: <br /> Ach.Engr Base Contract CRZ 75,000 x <br /> SubConsultanl Fees CRZ 24.600 x <br /> Architect Reimbwseables CRZ 5,000 x 1,772.00 <br /> Materials Testing Summit 2,500 x 1,000.00 <br /> Asbestos Testing MecTeo 1,480 x 230.00 <br /> Roof Tes 400 x <br /> Hasbonwgh Water and Sewer Fees 8pady 12,546 x <br /> utsza <br /> Equipment-617670036-800000.10043: <br /> Modando Equipment ARRA Mortmdo 57,985 x <br /> Modando Equipment ARRA Modando 0 x <br /> Hot Equipment ARRA Hog 106,059 x 1,451.31 <br /> Qually Refrigeration Quality 95,358 x <br /> Douglas Equipment ARRA Douglas 24,242 x <br /> Douglas Equipmer#casters 142 x <br /> Douglas Equipment Inslaludlon Hbm PkrMing 6,451 x <br /> Carpentry Ryan Stamay 2,500 x 122.96 <br /> Carpentry <br /> Concrete Apron,Landscaping Mackem 4,800 x <br /> Board Card ProNet 3,012 x <br /> Fencing Dickerson 4,793 x <br /> Fencing Dickerson 600 x <br /> Floor Mak4enance NICE 8.Green 901 x <br /> Path Jade Grainger 342 x <br /> NC Dept Admin 7 550x <br /> Dodo Levier,Certain <br /> Keying AOK 395 x <br /> Sink Fixtures-Hot Sink Fodures Hot 6,010 x <br /> Equipmerd-H.11 7 Hot 1,193 x 1.193.00 <br /> Equipment-Hot Varknbeer Hot 3,648x 1,153.80 <br /> Produce Washer Markel Fenn 8,150 x <br /> cstef Aucllon-Used Equipment Wester Auction <br /> yU 1.358 x <br /> Goorinsture Juice r Goodnaara 12,805 x <br /> OESCO UV Unit OESCO 17,620 x <br /> 359,101 0923 <br /> Designated Enterprise Fund Items: <br /> Operations and Personnel Funds 0 <br /> a <br /> Total Encumbered Project Cost 1,311,03 <br /> Budget Variance(surplusishortfall)1 delta 14,332 <br /> Percentage Variance delta(%) 1.011% <br /> 0 <br /> CA <br />