Browse
Search
Agenda - 10-01-2013 - 5g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 10-01-2013 - Regular Mtg.
>
Agenda - 10-01-2013 - 5g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 4:18:54 PM
Creation date
9/27/2013 11:28:56 AM
Metadata
Fields
Template:
BOCC
Date
10/1/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5g
Document Relationships
Minutes 10-01-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />INSTRUCTIONS FOR COMPLETING PETITION: <br />1. Complete Information Section <br />2. Identify Contact Person (This person serves as spokesperson for petitioner(s)). <br />3. Attach two (2) copies of recorded subdivision plat or property deeds, which refer to candidate road. <br />4. Adjoining property owners and /or the developer may submit a petition. Subdivision roads with prior <br />NCDOT review and approval only require the developer's signature. <br />5. If submitted by the developer, encroachment agreements from all utilities located within the right of <br />way shall be submitted with the petition for Road addition. However, construction plans may not be <br />required at this time. <br />6. Submit to District Engineer's Office. <br />FOR NCDOT USE ONLY: Please check the appropriate block <br />❑ aural Road ❑ Subdivision platted prior to October 1, 1975 X Subdivision platted after September 30, 1975 <br />REQUIREMENTS FOR ADDITION <br />If this road meets the requirements necessary for addition, we agree to grant the Department <br />of Transportation a right-of-way of the necessary width to construct the road to the minimum <br />construction standards of the NCDOT. The right -of -way will extend the entire length of the <br />road that is requested to be added to the state maintained system and will include the <br />necessary areas outside of the right -or -way for cut and fill slopes and drainage. Also, we <br />agree to dedicate additional right -of -way at intersections for.sight distance and design <br />purposes and execute said right -of -way agreement forms that will be submitted to us by <br />representatives of the NCDOT. The right -of -way shall be cleared at no expense to the <br />NCDOT, which includes the removal of utilities, fences, other obstructions; etc. <br />General Statute 136 -102.6 states that any subdivision recorded on or after October 1, 1975, <br />must be built in accordance with NCDOT standards in order to be eligible for addition to the <br />State Road System. <br />Form SR -1 (312006; Rev 1/2010) <br />
The URL can be used to link to this page
Your browser does not support the video tag.