Browse
Search
2013-398 IT - Varrow for Citrix Services $21,875
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-398 IT - Varrow for Citrix Services $21,875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2013 8:37:53 AM
Creation date
9/26/2013 8:14:04 AM
Metadata
Fields
Template:
BOCC
Document Relationships
R 2013-398 IT - Varrow for Citrix Services $21,875
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A2FDOFBC-4E1A-4308-A742-DE124C847BB6 <br /> 4 Skills and Stating Resources, <br /> Based on our present understanding of Customer's needs, we propose to provide the following <br /> resources: <br /> Resource <br /> Skills <br /> Project Manager Communications,level setting, progress checks,and overall management <br /> Enterprise Engineering Skilled and Certified Engineers with experience and expertise in Server <br /> Virtualization,Shared Storage,Networking and Application Virtualization <br /> 5 Project Assumpttions and,Constraints... <br /> • Any project documentation created by Varrow will be prepared in Varrow s standard format in <br /> Microsoft Word, Excel, PowerPoint, Project, Visio, HTML, and/or PDF. <br /> • Customer will acknowledge receipt and acceptance/rejection of all deliverables associated with <br /> this statement of work within ten (10) business days of delivery (excluding Federal Holidays). If <br /> such acknowledgement is not received within this period, all deliverables will be deemed <br /> acknowledged and accepted. <br /> • Any change to the scope of work explicitly described herein, and any associated additional fees, <br /> must be mutually agreed upon in writing via a Varrow Project Change Request ("PCR", "change <br /> order")form. <br /> • Any hosts to be migrated must be covered under vendor support including the hardware, Physical <br /> OS (if applicable), and Hypervisor(if applicable). <br /> • The scope of the project will require a senior consultant to be onsite for the time period allotted. It <br /> is assumed that the timeframe for the project will be in contiguous days. It is expected that the <br /> Customer IT manager will be available to work with the Varrow senior systems consultant during <br /> this time period. Time allotment will be made where the Varrow senior systems consultant will <br /> work independently to allow some level of flexibility in scheduling. <br /> • When and where appropriate, Varrow personnel may work offsite during the latter stages of the <br /> project, in order to expeditiously and efficiently generate necessary documentation. Both parties <br /> will exercise the appropriate amount of urgency with regard to scheduling of resources in which to <br /> complete the scope of this project. Customer agrees to expedite scheduling of downtime windows <br /> as necessary in order to meet the scope and requirements of this project. <br /> • Customer understands that Varrow staff members are hand-picked for suitability for the task at <br /> hand as well as availability. The resource assigned to the project or task may not be from a local <br /> Varrow office. <br /> 6 Cnstviner Responsibilities <br /> This following describes the Customer's responsibilities to Varrow with regard to this project. <br /> • Unless specifically addressed in this SOW, it is assumed that prior to the start of Varrow's <br /> services, Customer will have installed and tested any necessary hardware and software <br /> components (other than those detailed as Varrow tasks in this SOW)that are required to complete <br /> the services.All necessary product documentation will be made available to Varrow. <br /> • Customer project manager must have the authority to make project decisions and represent <br /> Customer in all matters related to this SOW. Customer's project manager will provide a single <br /> consolidated response to any review, approval, change, or decision request. <br /> • Customer shall designate appropriate individual(s) to work with the Varrow Project Manager and <br /> with the Varrow Engineering Resources. The appropriate Varrow staff will meet regularly with the <br /> Customer designed contact or delegated staff to discuss the status of the work in progress. <br /> • Customer staff will actively participate in this engagement, and individuals with relevant domain, <br /> business, and/or technical expertise will be available as required. These participants are the <br /> Orange County- IT Department <br /> Citrix Services Statement of Work: Revision C Va September 10,2013 <br /> Varrow Quote Reference: AAAQ16794 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.