Orange County NC Website
Temporary Use Building-A building, not intended for residential use, <br /> consisting of one or more modules constructed off the ultimate site of use. The , <br /> building is also not attached to a permanent or semi-permanent foundation. <br /> Ten-Year Transition, Land - Land located in areas that are in the process of <br /> changing from rural to urban,and are suitable for urban-type densities, including <br /> the provision of public utilities and services within the first ten year phase of the <br /> Plan. <br /> TauristHorne A-buildingor.group.of attached or.detached.buildiugscontaining, <br /> in combination, three to nine lodging units for occupancy for daily or weekly <br /> periods, with or without board, and primarily for occupancy by transients,as <br /> distinguished from rooming houses, in which occupancy is primarily by residents <br /> rather than transients. <br /> Amended Traffic Generation: Low-Uses which generate an average of less than 200 <br /> 2/7186 vehicle trips per day. <br /> Amended Traffic Generation: Medium -Uses which generate an average of between <br /> 2/7/86 200-800 vehicle trips per day. <br /> Amended Traffic Generation: High-Uses which generate an average of more than 800 <br /> 2/7/86 vehicle trips per day. <br /> Amended Transmission Lines- <br /> 11/2/81 a) For lines carrying electrical energy,transmission lines are those which <br /> carry 45,000 volts or more. <br /> b) For lines which carry liquids or gases,transmission lines are those <br /> operating or designed to operate at pressures of one hundred pounds per <br /> square inch or greater. <br /> Amended Travel Trailer-A structure that is(i) intended to be transported over the <br /> 3/18/86 streets and highways (either as a motor vehicle or attached to or hauled by a motor <br /> vehicle) and(ii)is designed for temporary use as sleeping quarters,but that does <br /> not meet the definition of a manufactured home. <br /> Amended Trip Generation Rates -The total count of trips to and from a study site per <br /> 2/1/88 unit of land use as measured by parameters such as dwelling units, acres, etc. <br /> Twenty-Year Transition Land-Land located in areas that are in the process of <br /> changing from rural to urban, and are suitable for urban-type densities including <br /> the provision of public utilities and services within the second ten year phase of <br /> the Plan. <br /> Urban Land-Land within the corporate limits of a town(and is therefore under <br /> the jurisdiction of the Land Use Plan for the town). <br /> 22-30 <br />