Browse
Search
ORD-1999-015 Text Amendments Development Standards in Cane Creek Watershed
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 1990-1999
>
1999
>
ORD-1999-015 Text Amendments Development Standards in Cane Creek Watershed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 2:53:22 PM
Creation date
9/25/2013 2:52:23 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
9c
Document Relationships
Agenda - 10-19-1999 - 9c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 10-19-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Orange County Zoning Ordinance <br /> 6.23.3 STORMWATER INFILTRATION AND DETENTION <br /> 2. Non-Residential Development <br /> Amended 1/4/94 <br /> DISTRICT. IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br /> (NON-RESIDENTIAL) <br /> UNIV-CA Same as Residential (See previous Table) <br /> UNIV-PW <br /> CANE-CA. 5-acre minimum lot size, with potential of up to five lots as small as <br /> two acres for lots of record October 19, 1999; <br /> AND <br /> 6% impervious surface limit, <br /> BMPs cannot be used to satisfy watershed requirements. <br /> CANE-PW 5-acre minimum lot size, with potential of up to five.lots as small as <br /> two acres for lots..of record October 19, 1999;. <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers; <br /> AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff, <br /> AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres in <br /> CANE-PW). <br /> BMPs cannot be used to satisfy watershed requirements. <br /> U-ENO-CA 2-acre minimum lot size <br /> AND - - <br /> 6%. impervious surface limit <br /> BMPs cannot be used to satisfy watershed requirements. <br /> HYCO-PW 50% ISR for all fire stations and solid waste collection centers; <br /> FLAT-PW AND <br /> 12% ISR for all other non-residential, uses; <br /> AND . <br /> on-site infiltration of the first inch of stormwater runoff, <br /> AND <br /> a limit of 1% of the watershed for non-residential use (37 acres in. <br /> HYCO-PW, 66 acres in FLAT-PW). <br /> BMPs cannot be used to satisfy watershed requirements. <br /> HAW PW 24% impervious surface limit. <br /> JORDAN-PW BMPs cannot be used to satisfy watershed requirements. <br /> gatxtamend\canecrk\res.doc\10-8-99*1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.