Browse
Search
1999 S Purchasing - Bid Award Electrical Work to make Standford Middle School Generator Ready - Pendergraph Electric Inc
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 S Purchasing - Bid Award Electrical Work to make Standford Middle School Generator Ready - Pendergraph Electric Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:56:17 PM
Creation date
9/25/2013 12:55:22 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8c
Document Relationships
Agenda - 10-19-1999 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 10-19-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to sureties as a defense in the jurisdiction of the suit tractor of any amounts received or to be received by <br /> shall be applicable. the Owner in settlement of insurance or other claims <br /> 10 Notice to the Surety,the Owner or the Contractor shall for damages to which the Contractor is entitled, re- <br /> be mailed or delivered to the address shown on the sig- duced by all valid and proper payments made to or on <br /> nature page. behalf of the Contractor under the Construction Con- <br /> tract. <br /> 11 When this Bond has been furnished to comply with a 12,2 Construction Contract:The agreement between <br /> statutory or other legal requirement in the location where the Owner and the Contractor identified on the sig- <br /> the construction was to be performed,any provision in this nature page, including all Contract Documents and <br /> Bond conflicting with said statutory or legal requirement changes thereto. <br /> shall be deemed deleted herefrom and provisions con- <br /> forming to such statutory or other legal requirement shall 12.3 Contractor Default: Failure of the Contractor, <br /> be deemed incorporated herein. The intent is that this which has neither been remedied nor waived, to per- <br /> Bond shall be construed as a statutory bond and not as a form or otherwise to comply with the terms of the <br /> common law bond. Construction Contract. <br /> 12 DEFINITIONS 12.4 Owner Default: Failure of the Owner,which has <br /> 12.1 Balance of the Contract Price: The total amount neither been remedied nor waived, to pay the Con- <br /> payable by the Owner to the Contractor under the tractor as required by the Construction Contract or to <br /> perform and complete or comply with the other terms <br /> Construction Contract after all proper adjustments thereof. <br /> have been made, including allowance to the Con- <br /> MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: (Corporate Seal) Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT A312 - PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. •AIA A <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 A312-1984 3 <br /> THIRD PRINTING•MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.