Browse
Search
1999 S Purchasing - Bid Award Electrical Work to make Standford Middle School Generator Ready - Pendergraph Electric Inc
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 S Purchasing - Bid Award Electrical Work to make Standford Middle School Generator Ready - Pendergraph Electric Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:56:17 PM
Creation date
9/25/2013 12:55:22 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8c
Document Relationships
Agenda - 10-19-1999 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 10-19-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond shall be construed as a statutory bond and not as a Construction Contract, architectural and engineering <br /> common law bond. services required for performance of the work of the <br /> 14 Upon request by any person or entity appearing to be a Contractor and the Contractor's subcontractors, and <br /> potential beneficiary of this Bond, the Contractor shall all other items for which a mechanic's lien may be <br /> promptly furnish a copy of this Bond or shall permit a copy asserted in the jurisdiction where the labor, materials <br /> to be made. or equipment were furnished. <br /> 15 DEFINITIONS 15.2 Construction Contract:The agreement between <br /> the Owner and the Contractor identified on the sig- <br /> 15.1 Claimant: An individual or entity having a direct nature page, including all Contract Documents and <br /> contract with the Contractor orwith a subcontractor of changes thereto. <br /> the Contractor to furnish labor, materials or equip- 15.3 Owner Default: Failure of the Owner,which has <br /> ment for use in the performance of the Contract. The neither been remedied nor waived, to pay the Con- <br /> intent of this Bond shall be to include without limita- tractor as required by the Construction Contract or to <br /> tion in the terms"labor, materials or equipment" that perform and complete or comply with the other terms <br /> part of water, gas, power, light, heat, oil, gasoline, thereof. <br /> telephone service or rental equipment used in the <br /> MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: (Corporate Seal) Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT A312- PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. -AIA <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006 A312-1984 6 <br /> THIRD PRINTING-MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.