Orange County NC Website
5 <br /> the sewer system with respect to the property covered by the <br /> Sewer Easement and Agreement signed by them within 30 days <br /> of notification that connection can be made. Acreage Fees <br /> shall be paid by the user with a completed and signed Efland <br /> Sewer System Sewer Easement and Agreement. <br /> D. Stub-out Service Line Fee [Reserved] . <br /> Each person, firm, or corporation <br /> connecting to the system (hereafter user or users) shall pay <br /> a stub-out service line fee in an amount equal to the <br /> administrative and construction cost to orange County of <br /> installing a service line. This fee shall be based on the <br /> out-of-pocket cost to orange County for installing the <br /> service line plus an allocated cost equal to the <br /> administration cost to orange County of having the <br /> installation accomplished. The original 212 potential Efland <br /> Area Sewer System customers who have provided orange County <br /> with an application for sewer service to the Efland Sewer <br /> System and who have provided Orange County with a <br /> signed - and acknowledged Efland Sewer System ; Sewer <br /> Easement and Agreement but have not been connected <br /> to the system because their property affected by <br />