Orange County NC Website
38 <br /> Existing and Proposed Ordinance Provisions:[Underline indicates proposed text.] <br /> 47 ID UILLE. Improvements <br /> [This existing paragraph is to be moved from V-D-8-c]Improvements proposed <br /> by the subdivider or required by this Ordinance, such as street pavement, curb and <br /> gutter, and sidewalks, shall be constructed in accordance with the standards and <br /> requirements as provided in this Ordinance,provided that where said <br /> improvements are to be constructed subsequent to the approval of the Final Plat, <br /> plans and specifications for said improvements shall be approved by the <br /> appropriate agency and reference to said improvements shall be made part of the <br /> Final Plat as provided in Section V-D-7-a. <br /> III-E-1. Financial Guarantee <br /> Before a final plat of a subdivision shall be approved, improvements shall be <br /> pr-evled-asfalws installed. inspected and approved. or a security bond, or-C-Mh <br /> escrow agreement, or a satisfactory, irrevocable letter of credit by an approved <br /> institution and as approved by the Orange County Attorney shall be posted with <br /> Orange County by the subdivider to provide for the completion of the required <br /> improvements. <br /> The financial guarantee shall be effective for 372 days after the Certificate of <br /> Improvements is signed by the County Manager. The amount of the bond, letter of <br /> credit. or escrow agreement shall be 110 percent of the construction cost estimate <br /> described in Section III-E-2. <br /> III-E-2. Construction Cost Estimate <br /> The financial guarantee shall be accompanied by an itemized estimate for the cost <br /> of construction which includes quantities and unit,prices for construction <br /> materials and activities such as clearing and grading. The estimate shall be <br /> prepared by an engineer, contractor. or other individual qualified to calculate the <br /> cost to complete the improvements according to approved plans and <br /> specifications. who has no direct or indirect ownership interest in the subdivision. <br /> The construction cost estimate shall include a ten percent(10%) construction <br /> contingency to account for unanticipated conditions or circumstances discovered <br /> souring the development onr cess. <br /> III-E-3. Maintenance of Improvements <br /> Improvements installed as a requirement of subdivision approval shall be <br /> maintained by the developer until said improvements are accepted for <br />