Browse
Search
Agenda - 08-05-1996 - VIII-M
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1996
>
Agenda - 08-05-1996
>
Agenda - 08-05-1996 - VIII-M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 9:23:57 AM
Creation date
9/25/2013 9:23:54 AM
Metadata
Fields
Template:
BOCC
Date
8/5/1996
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 19960805
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 18 <br /> DRAFT 7/9/96 PLANNING BOARD MINUTES S <br /> b. Preliminary Plans <br /> (1) Grand Oaks Estates-Phase IV <br /> (15 Lots-Eno Township) <br /> Presentation by Eddie Kirk. <br /> The property is located just east of Grand Oak Estates Phase I and II.Grand Oak <br /> Estates is off Saint Mary's Road(SR 1002)in Eno Township. It is zoned A-R and <br /> designated Lower Eno Protected Watershed(L-ENO-PW)in the Land Use Element' <br /> of the Comprehensive Plan. Kirk indicated the location on the County map. <br /> The area proposed for development is 24.978 acres in size with 15 lots proposed.Lot <br /> sizes range from 1.018 to 3.371 acres. A 15.52 acre tract will be remaining for <br /> future development. <br /> Access to the property is from Phase H of Grand Oak Estates. When this phase was <br /> approved there was a stubout constructed to the eastern property line. Access will be <br /> through this stubout. The streets will be public and constructed to NCDOT <br /> standards. Access to the 15.52 acre tract,when developed,will be through a right- <br /> of-way that was established when Phase I was developed.This access will be <br /> required to be constructed to State standards with development of the 15.52 acre <br /> tract. <br /> Each lot will be served by individual wells and septic tanks except lot 61 which was <br /> found to be unsuitable for a septic system. <br /> The Planning Board approved the Concept Plan for Grand Oak Estates Phase IV on <br /> April 15, 1996. The road layout is the same as approved on the Concept Plan.The <br /> southern cul-de-sac has been moved closer to the eastern property line for septic <br /> purposes. <br /> The Planning Staff recommends approval of the Preliminary Plan for Grand Oak <br /> Estates Phase IV subject to the conditions contained in the Resolution of Approval <br /> (an attachment to these minutes on pages ). <br /> Barrows asked about lot 61 from the concept plan. Kirk responded that it did not <br /> have suitable soils so it is considered an unbuildable lot. <br /> MOTION: Strayhorn moved approval as recommended by the Planning Staff. Seconded by <br /> Rosemond. <br /> VOTE: Unanimous. <br /> AGENDA ITEM#9: MATTERS HEARD AT PUBLIC HEARING 5/28/96 <br /> a. Stoney Creek Basin Small Area Plan <br /> Presentation by Gene Bell. <br /> On December 5, 1994,the Orange County Board of Commissioners adopted the charge: <br /> "To prepare a land use plan,including recommendations for implementation,for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.