Browse
Search
Agenda - 09-26-2013 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-26-2013 - Joint Mtg. - School Boards
>
Agenda - 09-26-2013 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:57:07 PM
Creation date
9/20/2013 4:33:57 PM
Metadata
Fields
Template:
BOCC
Date
9/26/2013
Meeting Type
Schools
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 09-26-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />41 <br />Orange County Schools <br />Facilities Assessment Timeline <br />Over the past year, Orange County Schools (OCS) has undertaken three important <br />studies to comprehensively reflect the District's facility needs for the foreseeable future. <br />They are as follows: <br />December 2012 —OCS received Facilities Assessment Report from the <br />Department of Public Instruction <br />• This report identified areas where maintenance and capital expenditures <br />would be needed, but did not provide specific work details nor cost <br />estimates. <br />• Maintenance items have been addressed. <br />April 2013— Acknowledging the ever- increasing need to ensure safety in our <br />schools to the extent practicable, OCS commissioned Safe Havens International <br />to conduct a facilities assessment focusing on safety and risk management <br />practices in schools and District buildings. <br />• This excellent report holistically explored the effect facilities have on safety <br />and recommended several modifications. Funding constraints have <br />prohibited facility modifications or the addition of system controls to <br />address many of these recommendations. <br />• The report further identified work practices that should be changed to <br />promote a safer environment in the schools. Those recommendations are <br />currently being implemented within current funding. <br />October 2013 —The Board of Education will retain a consultant to conduct a <br />facilities assessment which builds on the findings of the other reports and adds <br />the needed detail and analysis for capital facility costs. The timeline for <br />completion of this report is as follows: <br />• Facilities Assessment Proposal due: 12:00 noon EDT October 3, 2013 <br />• Anticipated date of award: No later than October 28, 2013 <br />• Preliminary report requested no later than December 31, 2013 <br />• Final report requested no later than January 31, 2014 <br />This full body of work should provide information upon which the Orange County Board <br />of Education can confidently base future capital decisions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.