Orange County NC Website
W C EL HILL - <br />RBIO <br />SCFEooL <br />Option 2 <br />CHAPEL HILL HIGH SCHOOL <br />25 <br />Option 2 consists of adding small additions that will <br />increase the existing school's student capacity. This <br />option also includes the renovation of existing buildings <br />from Option 1. This option provides a 15 -20 year <br />solution. <br />TOTAL PROJECT COST: <br />$16,982,344 (Low) to $19,494,159 (High) <br />Additional square footage = 26,543sf <br />Total campus square footage including new addition = 267,654sf <br />Increased capacity to 1625 by adding 105 seats <br />MOSELEYAf CH ITECTS <br />