Orange County NC Website
W C EL HILL - <br />RBIO <br />SCFEooL <br />Option 3 <br />ESTES HILLS ELEMENTARY SCHOOL <br />W.11 <br />Option 3 includes the deconstruction of existing buildings on the <br />campus that require excessive renovation and have exceeded <br />their useable life. Larger additions are added in this option to not <br />only replace the buildings that have been deconstructed but <br />increase the student capacity. This option provides a 50+ year <br />solution. <br />TOTAL PROJECT COST: <br />$13,358,710 (Low) to $16,715,364 (High) <br />New square footage = 43,050 sf <br />Total campus square footage including new addition = 84,572 sf <br />Increased capacity to 585 by adding 58 seats <br />MOSELEYAf CH ITECTS <br />