Browse
Search
Agenda - 09-26-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-26-2013 - Joint Mtg. - School Boards
>
Agenda - 09-26-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 4:01:09 PM
Creation date
9/20/2013 4:25:40 PM
Metadata
Fields
Template:
BOCC
Date
9/26/2013
Meeting Type
Schools
Document Type
Agenda
Document Relationships
Minutes 09-26-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57 <br />County Capital Projects <br />Fiscal Years 2013 -18 <br />Project Name Emergency Services Meadowlands <br />Project Status <br />Approved <br />Functional Service Area Governing and Management <br />Starting Date <br />71112012 <br />Department Asset Management Services <br />Completion Date <br />613012014 <br />Current <br />Year 1 <br />Year 2 Year 3 Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />I Fiscal Year <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Proiect Budqet Fundinq 2012 -13 <br />2013 -14 <br />2014 -15 2015 -16 2016 -17 2017 -18 Total <br />Year 10 <br />Land /Building <br />Construction /Repairs /Renovations 3,531,714 <br />Rear area impervious surface installation <br />Additional site /dock work (create exterior dock @ pallet width) <br />Equipment/Furnishings <br />MIRV upfit <br />Other building (sound insulation, awning, <br />rollup door openers) <br />Facility build out (ramp) <br />Total Project Budget 3,531,714 <br />100,000 100,000 <br />25,000 <br />12,500 <br />37,500 1 1 <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />- - <br />Revenues /Funding Source <br />Transfer from General Fund 1,362,991 37,500 <br />100,000 100,000 <br />Transfer from Projects 283,723 <br />Debt Financing 1,885,000 <br />Total 3.531.714 37.500 <br />100.000 100.000 <br />Project Description /Justification <br />Funding for this project would allow approximately 11,000 square feet of area to the rear of the Emergency Services facility at 510 Meadowlands to be developed as a <br />gravel, multi- function area, in order to allow full utilization of the site during emergencies. The current grassy area would not support vehicular traffic, heavy staging of <br />materials /supplies, set up of emergency services tents, etc. Current regulations require any area which exceeds 2,500 square feet to be engineered and constructed with <br />site drainage and subsurface drainage pursuant to impervious surface requirements. Included for FY 2012 -13: 1) installation of sound deadening materials above the call <br />center to reduce overhead noise; 2) installation of a canopy at exterior access door to provide protection from elements; 3) supply & installation of automatic openers for <br />roll -up doors (safety /worker comp issue), and 4) improvements to multi- incident response vehicle (MIRV). 01/2012 UPDATE: 5) to include construction of a loading <br />dock /apron to allow unloading of pallets onto an exterior surface. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.