Browse
Search
Agenda - 09-26-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-26-2013 - Joint Mtg. - School Boards
>
Agenda - 09-26-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 4:01:09 PM
Creation date
9/20/2013 4:25:40 PM
Metadata
Fields
Template:
BOCC
Date
9/26/2013
Meeting Type
Schools
Document Type
Agenda
Document Relationships
Minutes 09-26-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
104 <br />Water & Sewer Utilities Capital Projects <br />Fiscal Years 2013 -18 <br />Project Name Lake Orange Capital Maintenance <br />Project Status <br />Approved <br />Functional Service Area Community and Environment <br />Starting Date <br />71112009 <br />Department Planning <br />Completion Date <br />913012013 <br />Current <br />Year 1 <br />Year 2 Year 3 Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />Fiscal Year <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Proiect Budaet Fundina 2012 -13 <br />2013 -14 <br />2014 -15 2015 -16 2016 -17 2017 -18 Total <br />Year 10 <br />Professional Design Services <br />Land /Building <br />Construction /Repairs /Renovations <br />Equipment/Furnishings <br />Total Project Budget <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />Revenues /Funding Source <br />Transfers from General Fund <br />County Capital Fund Balance <br />Total <br />Project Description /Justification <br />70,310 <br />206,690 69,300 - <br />277.000 69.300 - - - - - - - <br />165,000 69,300 - <br />112,000 <br />277.000 69.300 - - - - - - - <br />Lake Orange has been in operation since the late 1960s. Besides minor repairs and mowing of the dam, there has been no routine maintenance performed on the dam <br />or spillway over the last 40 years. In 2009, engineering staff initiated an inspection of the dam by a qualified engineer to identify and quantify some suspected <br />deficiencies in the dam and spillway. The result of this inspection was a report that prioritized several necessary repairs and suggested other ongoing maintenance <br />items. The most urgent of these repairs are going to be completed this fiscal year and are part of the capital project listed above. Also included in the capital project <br />listed is a project to modernize the gate technology at the Lake by installing a new gate that will be controlled electronically and can be monitored and adjusted remotely <br />After that, the routine maintenance suggested will not be part of a capital project, but will become part of the annual operation and maintenance budget for Lake Orange <br />1:64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.