Browse
Search
Minutes 06-06-2013
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2013
>
Minutes 06-06-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2013 11:18:14 AM
Creation date
9/18/2013 11:10:20 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2013
Meeting Type
Budget Sessions
Document Type
Minutes
Document Relationships
Agenda - 06-06-2013 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 06-06-2013 - Budget Work Session
Agenda - 06-06-2013 - 1-3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 06-06-2013 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Services: <br /> Budget Highlights <br /> • The Capital Outlay for FY 2013-14 includes $16,000 for the third year of a three year <br /> program to purchase and install AED's in County facilities, and $1,975 for a door card <br /> access system. <br /> • The FY 2013-14 Manager Recommended Budget includes full year funding for a Radio <br /> Systems Technician position (1.0 FTE) approved in November 2012. <br /> • The FY 2013-14 Manager Recommended Budget includes $27,300 in Contract <br /> Services for the installation of HVAC systems currently in stock to provide back up to <br /> 9 1-1 Center and Emergency Operations Center (EOC,) in the event of equipment or <br /> power failure. Additional system will be installed in the warehouse to regulate <br /> temperature. <br /> • The "sitdown" forklift that was purchased with the 510 Meadowlands building no longer <br /> functions and is not serviceable, given its age. Without a replacement, Emergency <br /> Services is not able to unload delivery trucks, which is a critical function during <br /> Strategic National Stockpile distributions and disaster operations. The current forklift is <br /> not rated at an appropriate weight capacity to serve the needs of the Emergency <br /> Services/the county; the new forklift offers additional weight capacity to ensure that ES <br /> can fulfill loading/unloading needs during normal and disaster operations. A lease <br /> option of$4,167 is included in the FY <br /> 2013-14 Manager Recommended Budget. <br /> • The FY 2013-14 Manager Recommended Budget includes additional funds of$22, 125 <br /> for uniforms for additional staff and re-branding the entire department. <br /> Life Safety Division: <br /> Budget Highlights <br /> • The FY 2013-14 Manager Recommended Budget includes Capital Outlay funds of <br /> $26,835 for a Fire Extinguisher Training System, which will make fire extinguisher <br /> training safer for trainees and more cost effective, as well as the replacement of a <br /> current fit testing machine and fit testing cards, and includes a computer and printer to <br /> allow more portable fit testing for all emergency responders. <br /> • Includes full year funding of the Fire Marshal position that was budgeted in FY 2012-13 <br /> for six (6) months (starting January 1, 2013) <br /> Communications Division: <br /> Budget Highlights: <br /> • Consistent with the Comprehensive Assessment of EMS and 9-1-1/Communications <br /> Center Operations Study, the FY 2013-14 Manager Recommended Budget includes <br /> four new (4.0 FTEs) Telecommunicator positions and one new (1.0 FTE) Quality <br /> Assurance/Training Officer position, effective January 1, 2014 <br /> • The FY 2013-14 Manager Recommended Budget also includes full year funding of two <br /> (2.0 FTE) Telecommunicator which started January 1, 2013, and full year funding of a <br /> Quality Assurance/Training Officer position (1.0 FTE) approved in November 2012. <br /> • Includes increases in Overtime funding of$92,986 to meet Fair Labor Standards Act <br /> (FLSA) and for new positions. <br /> • The decrease in Operations for FY 2013-14 is due to moving the Motorola maintenance <br /> to the 9-1-1 Fund ($37,000), and not budgeting for the Narrowbanding project <br /> ($14,800) which was completed in FY 2012-13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.